ALEX BLYTHE · 2026-09-21 · RETAINED-EVIDENCE CORRECTION AUDIT
HX-CFD-QUAL-01 V2.1 acceptance-path correction
A bounded audit of the evaluator and retained fine-grid continuation evidence. No CFD was rerun, and the historical qualification disposition was not rescored.
Current disposition
DIAGNOSTIC_CORRECTION_COMPLETE
HX-CFD-QUAL-01 remains FAILED_NUMERICAL_GATES. Mesh independence remains NOT_EVALUATED. HX-03 and HX-04 remain blocked.
What was corrected
- The field-stationarity predicate now requires non-empty finite normalized RMS updates at or below the frozen
0.001limit. The prior predicate checked only that values were greater than zero. - The continuation analyzer now reports the retained
surfaceFieldValuerows through 1000 s instead of claiming that post-800 s monitor rows were absent.
Retained continuation evidence
| Quantity | Result | Interpretation |
|---|---|---|
| Shell outlet temperature span, 800–1000 s | 0.002804 K | Supporting evidence; not a qualification pass |
| Tube outlet temperature span, 800–1000 s | 0.001040 K | Supporting evidence; not a qualification pass |
| Tube U global normalized RMS, 900–1000 s | 0.000762 | Below the declared global stationarity limit for this interval |
| Tube U declared local normalized RMS | 0.000791 | Not a valid localized manifold metric; the mask covers 98.646% of tube cells |
Evidence limits that remain
- The declared
x ≤ 0.05 mmask contains 391,955 of 397,335 tube cells. It does not isolate the inlet manifold. - Field comparisons are positional/truncated rather than proven by explicit cell identity or topology correspondence.
- Endpoint
p/p_rghvalues include negatives while the declared property-pressure interval begins at 0 Pa. Pressure-reference semantics remainNOT_ESTABLISHED. - Full hot/cold energy-storage closure and integrated conductive interface heat-rate evidence remain unresolved in this branch.
Artifact integrity
Continuation source immutability remains true. The corrected continuation manifest is parseable and verifies 219 artifacts with 0 missing and 0 mismatches.
Download Markdown report · Download structured results · Verification
Next authorized step
Repair the local-region definition, explicit field correspondence, pressure-reference interpretation, and complete energy/interface evidence in a versioned acceptance contract. Then decide whether a fresh three-grid campaign is warranted. No qualification or mesh comparison is authorized by this audit.
Prepared by Alex Blythe · Report date: . This is an evidence correction, not a design release or experimental validation.